127 Energy
  • HOME
  • SOLUTIONS
    • Solar Photovoltaic (PV)
    • Energy Storage
    • Solar + Storage Microgrids
    • Advisory Services
  • FINANCING
  • PROJECT CASE STUDIES
  • ABOUT US
  • CONTACT
Case Study

California Winery

Project Info
Size
556 kWh battery energy storage

Location
Napa County, California

Date of completion
2021
​
Value Proposition
Backup power
Demand charge management
​TOU arbitrage
Overview
127 Energy engineered and delivered a 250 kW/550 kWh battery storage system as part of a resilient clean energy microgrid for the Castello di Amorosa winery located in Calistoga, CA. The battery system interfaces with other energy assets present at the winery, such as a new 450 kW solar array and backup generator. Not only will the winery benefit from hours of clean backup power in the event of a utility grid outage, the battery system will increase the winery’s overall operational flexibility and energy efficiency, and offset carbon emissions and electricity costs.
Animate On Scroll.

​Project Challenge
Delivering energy savings and resilient backup power supply within a zero export utility limitation
Animate On Scroll.

​Our Solution
Microgrid featuring battery energy storage solution​
Picture

​

​1300 1st Street, Napa, CA 94559
Clean Energy Solutions
Financing Solutions
​Our Experience​
Company News
Home
Meet Our Team​
​Contact
Picture

Picture
Picture
Picture
127 Energy, LLC
​All rights reserved. 
©2023 
  • HOME
  • SOLUTIONS
    • Solar Photovoltaic (PV)
    • Energy Storage
    • Solar + Storage Microgrids
    • Advisory Services
  • FINANCING
  • PROJECT CASE STUDIES
  • ABOUT US
  • CONTACT